Other information:
System Operation
System Diagram - Gauges
Gas
Item
Description
1
GWM
2
IPC
3
PCM
4
Fuel pump and sender unit
5
Base/mid-level analog gauges
6
Temperature
7
Fuel
8
Speedometer
9
Tachometer
10
AWD
11
Base level virtual gauge
12
AWD
13
Mid-level virtual gauges
14
Fuel
..
Removal
NOTE:
Removal steps in this procedure may contain installation details.
NOTE:
The EBB and the ABS module are serviced as an assembly and should not be separated.
NOTE:
The PMI process must begin with the current ABS module installed. If
the current ABS module does not respond to the diagnostic scan tool, the
tool may prompt for As-Built Data as part of the repair.
..