Ford Escape: Engine Cooling / Removal and Installation - Coolant Pump
Special Tool(s) /
General Equipment
Hose Clamp Remover/Installer |
Removal
-
Drain the cooling system.
Refer to: Engine Cooling System Draining, Vacuum Filling and Bleeding (303-03C Engine Cooling, General Procedures).
-
Disconnect the electrical connector.
-
Release the clamps and disconnect the coolant hoses.
Use the General Equipment: Hose Clamp Remover/Installer
-
Remove the bolts, nut and the coolant pump.
Torque:
18 lb.ft (25 Nm)
Installation
-
To install, reverse the removal procedure.
-
Fill and bleed the cooling system.
Refer to: Engine Cooling System Draining, Vacuum Filling and Bleeding (303-03C Engine Cooling, General Procedures).
Removal
NOTE:
Removal steps in this procedure may contain installation details.
Drain the cooling system.
Refer to: Engine Cooling System Draining, Vacuum Filling and Bleeding (303-03C Engine Cooling, General Procedures)...
Removal
NOTE:
Removal steps in this procedure may contain installation details.
With the vehicle in NEUTRAL, position it on a hoist.
Refer to: Jacking and Lifting - Overview (100-02 Jacking and Lifting, Description and Operation)...
Other information:
DISASSEMBLY
Remove the transmission case cover.
Refer to: Transmission Case Cover (307-01B Automatic Transmission - Automatic Transmission – HF45, Removal and Installation).
If equipped, cut and discard the tie strap.
disconnect the park lock actuator...
NOTE:
Make sure the test is performed with the engine at
60.8
°F (
16
°C) or above.
Make sure the battery is fully charged. For additional information, refer to: Specifications (414-01 Battery, Mounting and Cables - 6.7L Power Stroke Diesel)
...