Other information:
Adjustment
Measurement
Measure the roof opening panel movable glass height/flushness.
Measure the roof opening panel sliding glass
front edge-to-header panel height/flushness. Refer to the specifications
as shown.
Measure the roof opening panel sliding glass
rear edge-to-roof opening panel fixed glass height/flushness. Refer to
the specifications as shown.
..
NOTE:
This step is only necessary when installing a new PTU or replacing a PTU seal.
Install the PTU heat shield.
Torque:
89 lb.in (10 Nm)
NOTE:
This step is only necessary when installing a new PTU or replacing a PTU seal.
If equipped, install the PTU temperature sensor harness bracket.
Torque:
97 lb.in (11 Nm)
..