Other information:
Removal
NOTE:
Removal steps in this procedure may contain installation details.
NOTE:
This step is only necessary when installing a new component.
The PMI process must begin with the current RGTM installed. If the
current RGTM does not respond to the diagnostic scan tool, the tool may
prompt for As-Built Data as part of the repair...
Special Tool(s) /
General Equipment
Resistance Spotwelding Equipment
Spot Weld Drill Bit
Locking Pliers
Removal
WARNING:
Electric vehicles damaged by a crash may have compromised
high voltage safety systems and present a potential high voltage
electrical shock hazard...