Other information:
Removal
NOTE:
Removal steps in this procedure may contain installation details.
With the vehicle in NEUTRAL, position it on a hoist.
Refer to: Jacking and Lifting - Overview (100-02 Jacking and Lifting, Description and Operation).
Remove the retainers, release the tabs and remove the air cleaner intake duct pipe...
System Operation
System Diagram
Item
Description
1
Intake manifold
2
EVAP canister purge valve
3
Fresh air hose
4
EVAP leak detection pump
5
EVAP canister
6
Fuel tank
7
Fuel pump and sender unit
8
Fuel tank isolation valve (also known as Tank Pressure Control Valve - TPC )
..