Other information:
Special Tool(s) /
General Equipment
Adhesive Tape
Removal
NOTICE:
To prevent damage to the clockspring, make sure the front wheels are in the straight-ahead position.
NOTE:
Removal steps in this procedure may contain installation details...
Body
The body consists of the following:
Front frame rails constructed of high-strength Dual Phase (DP) 600 steel
Rear frame rails constructed of Boron ultra high-strength steel
Fender reinforcement tube constructed of Dual Phase (DP) 800 high-strength steel
Fender apron assembly constructed of Dual Phase (DP) 600 high-strength steel
Liftgate outer panel constructed..